The Capacity system

Capacity is not headcount. Plan on what your team can really deliver.

Nine reps funded and eight in seat can be 7.5 reps of real capacity. Beacon plans your hiring on what your team can actually produce — tied to the revenue it carries, and never ahead of the cash.

Real capacity vs the planQ3 2026 · illustrative
Sales9 funded
Short · 1.5
Customer Success11 funded
Short · 9 of 11
Support9 funded
Watch · next quarter
The readout the org chart can’t give you: two teams are short — and the AE that slipped has to come back to October.
The blind spot in every plan

You funded nine reps. Eight are in seat — and not all at full speed.

The org chart
Nine reps on the sales plan. Eight hired, eight started.
The catch
One of the eight is still ramping, and the ninth slipped. The plan counts nine.
The hiring spreadsheet
This year’s headcount plan, and what it costs per month.
Never sees
The revenue each hire is meant to carry — or whether the cash supports them.
The forecast
The revenue the year promises, month by month.
Never sees
Whether there’s enough ramped capacity to deliver it.
The miss lands two quarters later.Revenue comes in under plan for a reason nobody can name. The capacity was never there — but nothing recorded the ramp, so it gets blamed on effort. And the next plan is built on the same headcount.
The other half of the system

And the capacity you were never able to buy.

Everything above is the capacity you plan around. This is the half you add: the analytical work every system needs and nobody was ever hired to do — the roles you would open next, if you could.

It already exists.Thirty-four analytical roles, briefed on your own numbers, working across all six systems.
It works every working day.Not when someone finds an afternoon for it. The same work, at the same hour, whether or not anyone asked.
Its work always lands.Every run ends in one of three places — never in a queue nobody reads.
Briefed Drafted Done The bench, role by role: the roles Beacon covers →  ·  what each system gets from it: Capacity for every system →
The short version

One gap, followed to the end — in four moves.

The rest of this page is one story: a sealed $52M plan, and a sales team running 7.5 of the nine reps it funds. Here’s how Beacon takes it from found to fixed.

1
See the gapOne board: every team’s real, ramp-weighted capacity against what the sealed plan needs.
2
Trust the numberRole-by-role math — quota, ramp, real hours — is how eight in seat reads as 7.5 real.
3
Price it in revenueA capacity gap is a revenue gap with a date — and it caps the whole customer lifecycle.
4
Seal with a green lightNo target, scenario or re-steer becomes the plan until capacity clears the check.
One board

Every team’s real capacity, against the plan it carries.

Ramp-weighted capacity vs what the sealed plan needs — the gap, the cost, and the date the fix must start.

Running the sealed Grow hard plan · $52M by December 2027
7.5 of 9
Sales — real ramp-weighted capacity vs the nine the plan funds
1.5 reps short
The gap to the plan · the ninth AE lands November
$3.4M pipeline
Uncovered while the gap stays
Salesquota-carrying reps
83%7.5 of 9 · pull the AE back to October
Customer Successbooks of business
82%9 of 11 books covered · short on the base
Supporttickets per week
91%Tightens next quarter · illustrative
Onboardinggo-lives per month
100%7 of 7 go-lives covered
Real ramped capacityGap to planWhat the plan needs
The gap

The plan funds nine AEs. Eight are in seat, one of those is still ramping, and the ninth slipped to November — so the board reads 7.5. Pulling that AE back to October costs $150k of runway: 22.0 → 21.7 months, and the 12-month floor holds either way. Customer Success is short on its own side at 9 of 11 books — a second constraint, on the base rather than on new business.

The same gap Track & re-steer catches in week three — visible here before the quarter opens. (Illustrative.)

Where the numbers come from

What good means, role by role.

How did eight reps in seat become 7.5 on the board? Each role gets its own unit, its own bar for full productivity, and its own ramp — set in setup, kept honest against actuals.

Account executive

new ARR
Quota$265k / quarter
Ramp to full4 months
Selling time60% of week

Success manager

renewals
Book size$2M ARR
Ramp to full2 months
Customer-facing70% of week

Support agent

tickets
Weekly pace80 tickets
Ramp to full6 weeks
Sustainable load85% of peak

While someone ramps, the plan counts a fraction of them — that’s how eight in seat reads as 7.5 real. Quotas, books and paces are yours to set; illustrative defaults shown.

Capacity to revenue

Your forecast is only as strong as your capacity.

The board’s rep-and-a-half gap, in revenue terms. Beacon builds the forecast from ramped capacity — so the gap prices itself, and the AE coming back shows you the month you’re on plan again.

CAPACITY VS PLAN $3M$4M$5M JunJulAugSepOctNovDec THE GAP PLAN NEEDS CAPACITY BACK ON PLAN
Plan needsRamped capacitynew ARR per quarter · illustrative
With the AE back in October
Back on plan by February
Read off the one sealed forecast
The lifecycle check

Revenue moves at the pace of the tightest team.

Sales isn’t just one team’s problem. Demand flows marketing → sales → onboarding → success, and the whole lifecycle runs at whichever stage can carry the least — outperforming upstream can’t buy the gap back.

Marketingdemand it can hand off
1.3×
Ahead of plan
Salesdeals it can work
0.83×
Constraint · new revenue
Onboardinggo-lives it can run
1.0×
Covered
Customer Successbooks it can carry
0.82×
Constraint · the base
$3.4M

Marketing is beating plan — and the extra demand dies in the sales queue. Until the AE is back, sales converts at 0.83×: $3.4M of pipeline nobody covers, however strong the top of the funnel runs. Customer Success is tighter still at 0.82× — it caps the base rather than the new business, and it takes its own fix.

The fix never lives upstream of the constraint — which is why nothing seals without the check below.

The green light

The Grow hard plan doesn’t seal until capacity clears.

Every target, scenario and re-steer runs this check before it becomes the plan of record. Here it comes back with one condition — the AE that slipped.

The plan you’re sealing
Grow hard
$52M
ARR by December 2027
Capacity check — runs before anything seals
Capacity to deliverSales 1.5 reps short — clears when the AE comes back to OctoberConditional
Ramp timingThe AE carries full quota by February — inside the planClear
Cash to fund the pull-back$150k of runway — 22.0 → 21.7 months · floor holdsClear
Lifecycle throughputOnboarding 7 of 7 — nothing else caps the new-ARR planClear
!Clear to seal — with one condition.It seals the moment the AE comes back to October. Until then the gap stays priced: $3.4M of pipeline uncovered.

Targets, scenarios, re-steers — every plan runs this check before it seals. Green light, or exactly what’s blocking it.

The same check that seals your targets, on every plan that follows.

The next unit of capacity

The next unit of capacity doesn’t have to be a person.

The board said Support tightens next quarter — the next unit has to land before it does. Person or agent, it’s planned and ramped as capacity the same way. A person makes the call.

The next hire

Support agent #10

Readyin 8 weeks
Handlesthe judgment calls
Scales byhiring again

The right answer when the queue needs judgment, empathy, escalation.

vs
The same queue

A Beacon Agent

Readyin days
Handlesthe routine 38%
Scales byturning it on

The right answer when the queue is drowning in the repeatable. The 38% routine share is illustrative.

Same units, same math — Beacon plans both and proposes; a person makes the call. There is no per-agent price to weigh: Beacon is one price that includes everything, set by your own ARR. The agents are Beacon’s own crew — and you can build your own. Meet them on the AI system →

Start with capacity

Never plan on a headcount again.

Connect billing and your HR tool — see your real capacity, team by team, by lunchtime. Free at any size.

The rest of the Capacity system: the roles Beacon covers · capacity for every system · capacity to revenue · grow without adding headcount · whole teams, already staffed →